Can I connect here?
Firm headroom as a range: how much new capacity the substation is likely to take with firm feed-in rights. Plus the simulated loading of the 110 kV level and a tier that shows what the figure rests on.
For project developers
Drop a pin on the map or enter a MaStR registry number. The site report shows the nearest substations with headroom, curtailment, the queue ahead and the cable route. Calculated from public data and hourly weather, for Germany.
Book a conversationThe report compares the nearest public substations side by side, so you can see which connection point deserves a closer look.
Firm headroom as a range: how much new capacity the substation is likely to take with firm feed-in rights. Plus the simulated loading of the 110 kV level and a tier that shows what the figure rests on.
How much energy a new plant on a flexible connection loses if it is curtailed first: in a median year (P50) and in a high-loss year (P90), for 10 MW and as a curve for other plant sizes.
Planned wind parks and Federal Network Agency tender awards nearby that could claim the same headroom.
The report connects your site to each candidate and estimates the cable length: straight-line distance times a detour factor. Where parcel data is available, the detour follows the number of land parcels crossed; otherwise a flat factor applies.
Dead-end towers from OpenStreetMap are shown along the route corridor and at the substation. The actual cable route needs planning on the ground.
Every figure carries its source: measured, modelled or assumed. Where available, measured redispatch by the transmission system operators is shown next to the modelled curtailment. All assumptions can be inspected in the report.
For the best candidates, the platform prepares a grid connection enquiry to the responsible grid operator, which you send from your own email program. You can share the report as a link or print it.
A wind park rarely uses its grid connection to the full. With cable pooling, wind, PV and possibly storage share one connection. We calculate hour by hour across many weather years how much additional capacity fits.
We show both: how often the connection is full and how much energy would be curtailed over the year. We prepare this calculation as an analysis on request.
The headroom is a range from public data, not free capacity and not a reservation. The nearest substation is not automatically your connection point; the grid operator decides. Loading is simulated, transformer capacity is assumed by voltage class, and regional consumption is not included. Germany only. Not financial or investment advice.
Send us a coordinate or a MaStR registry number in advance. In the call, we show you the site report for your project.
Book a conversationAre you a grid operator? Congestion and feed-in at each substation30 minutes, online. Before the call, email us a park, a MaStR registry number, a substation or an asset list. In the call, we show you with numbers which options exist there. Afterwards you decide whether a pilot makes sense.