Congestion at each substation
We simulate hourly feed-in for substations at 100 kV and above. The basis is registered wind assets and solar parks of 1 MW and above from Germany’s MaStR registry, combined with hourly weather.
Transformer capacity is assumed by voltage class. The congestion map is a model from public data, not an operator measurement.