Solar heat-stress calculator (simplified)

Explore an illustrative solar example with adjustable inputs. No site weather is loaded in this calculator.

Simplified example calculation with fixed assumptions. The platform models your asset with hourly weather data and pvlib — talk to us.

Book a conversation
Example climate inputs

Manually set assumptions, not site measurements.

+1.5 °C
10
+3.0 °C

Adjusted heat stress

Assumption: weather weighted ×3 relative to climate trend

3.5 °C

Physical — component loss breakdown

Assumption: 15 °C cell-temperature baseline above STC + adjusted heat stress.

ComponentβTemperatureLoss
Jinko Solar 78HL4-BDV 630−0.35%/°C18.5°C−6.48%
SMA Solar Sunny Highpower PEAK 3−0.08%/°C18.5°C−1.48%
Total performance loss−7.96%
System — net solar output

Nominal capacity

0.630 MW

Adjusted example

0.580 MW

MW loss

−0.050 MW

Example system efficiency: 92.05%

Financial — illustrative loss value

Annual example value

€6,079

Not promised savings

Modelled capacity loss

8.0%

Assumption: 1,800 h/year — 49 hours at peak stress + 1,751 hours at baseline.

Whether a retrofit pays off depends on your tariff and the costs. We calculate it with your data.

Book a conversation

How this example works

Assumptions: 1,800 full-load hours/year; 15 °C cell-temperature baseline above STC (standard test conditions at 25 °C); weather weighted ×3 versus climate trend; +12% tracker gain. Component coefficients are fixed example inputs, not a verified equipment assessment.

01

Heat stress

Assumption: heatwave intensity = days × 0.3 °C. Weather is weighted ×3 relative to the climate trend. Adjusted stress = weather + climate trend ÷ 3.

02

Component temperature loss

Assumption: 15 °C baseline above STC plus adjusted stress. This temperature is multiplied by the fixed β coefficient (loss per °C) of the selected module and inverter.

03

Clipping

When inverter capacity is less than module capacity, clipping = max(0, 1 − inverter capacity / module capacity) × 100%. This is a simplified fixed-capacity comparison.

04

Net output

The component and clipping losses are subtracted from 100%. The remainder is applied to nominal capacity. Assumption: a single-axis tracker adds +12% versus fixed tilt.

05

Annual example value

Assumption: 1,800 full-load hours are split into heatwave hours (days ÷ 365 × 1,800) and remaining hours. Losses in MW × hours × your electricity price give the example value. It does not mean all losses can be recovered.