Wind and solar yield: what Europe's 2024 electricity year means for your portfolio
Back to blog
Energy & infrastructure

Wind and solar yield: what Europe's 2024 electricity year means for your portfolio

E
EnviroTrustEnergy editorial team

Historical period: EU electricity year 2024 · Report of 23 January 2025

Topic date:

Published:

In 2024, solar overtook coal in the EU electricity mix for the first time. For your portfolio, though, what counts is not the European annual total but the yield per asset, per hour and per tariff.

If you operate wind or solar parks, rising European electricity generation sounds like good news. It does not yet answer your most important question: how is the economic yield of your own assets developing? A growing generation mix can coincide with weaker production years at individual sites. Additional solar capacity can increase output without every additional megawatt hour earning the same revenue. Weather, technology, grid and marketing therefore have to be looked at separately and then brought together.

This article explicitly looks back at the 2024 electricity year. The occasion is Ember's European Electricity Review 2025, published on 23 January 2025. We publish this analysis on 5 October 2026. The historical figures do not describe the current electricity year and are not a forecast for your park. Instead, they show why a site-specific yield analysis for wind and solar has to go beyond European build-out figures.

What Ember actually found for 2024

Ember examines electricity generation and demand in all 27 EU member states for the full year 2024. According to the report, solar generated 304 terawatt hours and reached an 11 percent share of the EU electricity mix. Coal stood at 269 terawatt hours, or 10 percent. Solar thus overtook coal for the first time. Solar generation rose by 22 percent compared with 2023. Wind remained the second-largest source of electricity, behind nuclear and ahead of gas. These statements refer to the EU, not to Germany alone.

Ember's report also reports an increase in the renewable share from 34 percent in 2019 to 47 percent in 2024. That is a change in the whole generation system. It does not follow that an existing wind turbine or solar module produced correspondingly more electricity. New assets, their commissioning dates and the weather all act on the overall balance together. For decisions about existing parks, you need to keep these factors apart.

Why build-out and asset yield are different quantities

Installed capacity describes the output an asset can provide under defined conditions. Energy yield, by contrast, describes how much electricity is produced over a period. The capacity factor relates this amount of electricity to continuous generation at rated output. It helps you compare different years or sites. It is not, however, a complete economic metric. Two parks with a similar capacity factor can have different costs, downtime, grid limits and remuneration terms.

So first check what each statement refers to. Does growth relate to additional megawatts, megawatt hours generated or revenue? Was a full calendar year considered, or only the period since commissioning? Have electrical losses and shutdowns already been deducted? Without this distinction, a portfolio trend looks better or worse than it really is. A traceable yield model starts with a clean asset list and a clear definition of the result.

Wind energy: the hourly distribution is what matters

For wind, the average wind speed is not enough. A turbine converts different wind speeds into power in different ways. The power curve describes this relationship. Hours with little wind, hours in the productive range and hours above operating limits must therefore not be merged into a single average. Hub height and the rotor area also matter. For a first yield assessment, you should combine site weather with the characteristics of the specific turbine model.

EnviroTrust calculates the wind energy yield per turbine from hourly site weather and its power curve. The catalogue covers about 900 turbine models. Wind is extrapolated across the rotor area to hub height, that is, transferred by calculation to the right height. The results include a loss overview and P90/P50/P10 bands. These bands rank modelled yields by exceedance probability. They are not a promise that an asset will reach a certain yield next year.

The limitation is crucial: losses and uncertainty follow the structure of FGW TR 6. But the result is not a yield assessment according to FGW TR 6. There is no site visit, no local wind measurement and no wind-field modelling. You receive approximate values for a first review, not a certified yield assessment. Banks and project-finance lenders in particular should use this second view as a supplement and obtain the assessments their decision requires separately.

Solar energy: more irradiance is not the whole calculation

For a solar park, irradiance and temperature have to be considered together. A sunny, hot period can deliver a different electrical output than an equally sunny, cool period. Then there are the system configuration, soiling, inverter limits and degradation. When you compare two sites, you should therefore look at more than the annual sum of sunshine. What matters is when the irradiance occurs and how the chosen technology responds under the given conditions.

EnviroTrust's solar calculation uses a pvlib/PVWatts model chain with hourly irradiance and temperature. It accounts for soiling, temperature-related derating, inverter clipping and degradation, that is, the age-related change in output. This lets you set assumptions about PV yield side by side in a traceable way. Such a calculation replaces neither a review of the specific design nor a technical inspection of conspicuous components. If results deviate from operating data, measured data and knowledge of the asset remain necessary.

Read the weather record and the climate scenario separately

A single good weather year is not a robust basis for a long investment horizon. As its weather baseline, EnviroTrust uses the last 20 complete years at the site via the Open-Meteo archive. Up to and including 2016, this series is based on the ERA5 reanalysis, a computed reconstruction of past weather. From 2017, a finer-resolution weather model is used. This change in the data basis is part of the interpretation and should not be mistaken for a real change in climate.

For the future, the platform uses EURO-CORDEX on a grid of about 25 kilometres. The scenarios RCP 2.6, RCP 4.5 and RCP 8.5 describe different emission pathways; RCP 4.5 stands for a medium emission pathway here. They show how a site's capacity factor can shift under these assumptions. The spatial resolution, however, does not allow statements about every local terrain or shading feature. A climate scenario is also not a weather forecast for a particular future year.

From electricity generated to revenue

The European trend makes the revenue side especially important. In its report of 25 June 2025, the European Environment Agency describes renewable generation, electrification and flexibility as connected tasks. Its electricity market model for 2030 works with defined build-out and demand assumptions. It is a scenario, not a binding price forecast. For your portfolio, this means that even if you can trace a technical change in yield, you cannot simply derive an equally large change in revenue from it.

Use your own contract terms for economic comparisons. EEG refers to remuneration under the German support framework. A PPA is a power purchase agreement. When selling on the market, hourly day-ahead prices can be relevant. What matters is which revenue the affected generation hours actually trigger under your contract. Additional electricity in hours that are poorly remunerated anyway can contribute less economically than a smaller improvement in well-remunerated hours. Your assessment of measures should take this into account explicitly.

Explain losses before replacing technology

If your wind park stays below plan, a retrofit is not automatically the right answer. First check whether weather, availability, icing, grid limits or a technical fault explain the difference. For solar parks, you should distinguish, among other things, temperature losses, soiling and inverter clipping. A single annual figure hides these causes. Only a clear loss overview shows where a closer technical look could make sense.

EnviroTrust links risks such as icing, lightning, hail, extreme wind, component fatigue and an ageing rotor with possible measures. These include blade de-icing, lightning-protection upgrades, condition-based maintenance and rotor replacement or repowering, that is, renewing an asset. Whether such a measure makes sense depends on your price, the investment and operating costs, the planning horizon and the discount rate. We calculate this trade-off together with you. The results are planning values, not quotes and not guaranteed savings.

A shared view for mixed portfolios

Municipal utilities and suppliers should neither look at wind and solar in isolation nor simply add them up. Start with comparable site and time series. Then assign the assets to their shared connections. This shows you which questions sit at component level and which concern the connection or the whole portfolio. A high sum of individual asset yields does not equal an equally high amount of energy that can be fed into a limited shared grid connection.

EnviroTrust's portfolio hierarchy is plant, asset and component. A component can, for example, be a turbine, a PV component or a shared grid connection. Battery storage and grid connections are also asset types in the portfolio. They are assessed through the risk and measures register. There is no separate physical yield model for these two types. This limit should remain visible in every presentation, so that no further simulation capability is inferred from a portfolio overview.

What documents you need for a first review

You do not need to start with a fully cleaned-up data room. An asset list, a specific park or a number from Germany's market master data register (MaStR) can be enough to get started. Turbine model, hub height, PV configuration, documented operational deviations and remuneration terms are also helpful. Separate known facts from assumptions. For missing information, it should be clear who obtains it and how strongly it can affect the result. This turns the first review into an orderly working basis instead of a seemingly finished investment decision.

For German assets, the register link can be combined with the grid view. Weather and climate projections cover more than 30 European countries. MaStR import, substations, congestion analysis and flexible connection options, by contrast, are limited to Germany. This distinction helps you set up a cross-border portfolio correctly. You can look at the climate and yield side across Europe, but for the connection review outside Germany you should include the relevant national information and the responsible grid operators.

The next step for your park

The 2024 electricity year shows the progress of the energy transition. For your company, it creates a concrete review task: which yields are weather-related, which losses are technical or grid-related, and which measures pay off at your tariff? A good first assessment does not answer every question conclusively. It makes the open questions visible and helps you narrow down the next investigation sensibly. That is equally useful for operators, project developers and lenders.

For a 30-minute call, you send us a park, a MaStR number or an asset list. In the call, we show you your own asset with yield, climate shift and risks. You then decide whether a pilot with your portfolio makes sense. Our results do not replace a yield assessment and are not financial or investment advice. The economic assessment of possible measures uses your prices and costs, not a blanket promise of returns.

Sources and historical context

The European sources support the historical market context. The description of EnviroTrust's functions sets out the scope offered and its limits; it is not a statement by these institutions about our product.

Discuss your asset with us

30 minutes, online. Send us a park, a MaStR registry number or an asset list in advance. We show you your own asset with yield, climate shift and risks. Then you decide whether a pilot makes sense.

Book a conversationHow the platform works

Themen: wind energy · solar yield · yield model · climate scenarios

Let’s talk about your site

30 minutes, online. Before the call, email us a park, a MaStR registry number, a substation or an asset list. In the call, we show you with numbers which options exist there. Afterwards you decide whether a pilot makes sense.